On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
During the night, the cloud cover will break and decrease. There will still be light rain showers in some places in the southern regions of Bulgaria until midnight. On Sunday morning, visibility will be reduced in some places in the..
The Bulgarian Orthodox Church, headed by Patriarch of Bulgaria and Metropolitan of Sofia Daniil and members of the Holy Synod, sent a patriarchal and synodal Easter message to Christian believers. "May the joy of the news of..
When carrying out border control and compensatory measures, Border Police officers also carry out checks in the automated information system of the Ministry of Interior for undelivered electronic tickets and for fines imposed that..
Blind ultrarunner Victor Asenov has officially become part of the Everesting Hall of Fame, Sportal.bg reports. Between March 21 and 23, the..
Border Police remind that major repairs are underway on the Bulgarian section of the Danube Bridge in Ruse, and because of this, a temporary traffic..
Thirteen people were arrested in central Sofia during a specialized police operation aimed at countering illegal migration and preventing crimes..
+359 2 9336 661