Bulgaria’s Ministry of Finance announced that an inspection conducted by Public Financial Inspection Agency found serious violations in the completion of Hemus motorway. A contract between the Road Infrastructure Agency and Avtomagistralli EAD for the completion of Lots 7, 8 and 9 of Hemus Motorway to the tune of EUR 690 million excluding VAT was subject to inspection.
The inspection found that the estimated prices were inflated by more than EUR 9 million. Prices for various materials and construction works on the above-mentioned lolts of the motorway were also inflated. The inspection also found that the Public Procurement Act had been circumvented during subcontracting of construction works by Avtomagistral EAD under 15 design contracts.
The Bulgarian Ministry of Defense has signed a contract with Polish state company Wojskowe Zakłady Lotnicze Nr 2 S.A. for major repair of six MiG-29 aircraft engines. The maximum period for carrying out the repair of each engine will be no more..
The chief of police in Petrich and two other police officers, arrested two days ago, are accused of participating in a criminal group. This was announced by Sofia city prosecutor Iliana Kirilova, BTA reported. According to Kirilova, the detained..
The Sofia City Prosecutor's Office has announced the release of Dzheyhan Ibryamov. He will be released from custody tomorrow, November 7, and the investigation against him on charges of influence peddling will be suspended at the moment he takes the..
2.5% is the necessary effort that our country must make in terms of defence spending, caretaker Minister of Defense Atanas Zapryanov..
A protest organized by nationalist organizations in front of the Ivan Vazov National Theatre last night against the premiere of Bernard Shaw’s play..
On Friday, there will be fog in the valleys. The lowest temperatures will range between minus 5°C and 0°C, for Sofia around minus 3°C. It will be sunny..
+359 2 9336 661