Bulgaria’s Ministry of Finance announced that an inspection conducted by Public Financial Inspection Agency found serious violations in the completion of Hemus motorway. A contract between the Road Infrastructure Agency and Avtomagistralli EAD for the completion of Lots 7, 8 and 9 of Hemus Motorway to the tune of EUR 690 million excluding VAT was subject to inspection.
The inspection found that the estimated prices were inflated by more than EUR 9 million. Prices for various materials and construction works on the above-mentioned lolts of the motorway were also inflated. The inspection also found that the Public Procurement Act had been circumvented during subcontracting of construction works by Avtomagistral EAD under 15 design contracts.
56% of Bulgarians prefer the new 51st National Assembly to form a government, even if this is at the cost of compromises, indicate data of a national representative survey conducted by the polling agency "Gallup International" for the "Referendum"..
A Memorandum of Cooperation between Cluster Trakia Economic Zone and Shenzhen Polytechnic University (SZPU) was signed in Beijing by Katya Staykova, CEO of Cluster Trakia Economic Zone, and Ms. LI Yue, Vice President of the Chinese higher education..
Bulgarian President Rumen Radev today reiterated his request to the Constitutional Court to declare unconstitutional the amendments to the Constitution made by the 49th National Assembly. The Bulgarian Head of State's objections are against the..
According to an analysis by the Electricity System Operator, a shortage of electricity is expected as early as January and February next year. At a..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
+359 2 9336 661