The planned annual repairs of Unit VI of Kozloduy NPP have been completed five days ahead of schedule. On November 1, at 1.41 am, it joined the country's energy system after an inspection and approval by the Nuclear Regulatory Agency.
The unit was stopped on September 29. For 31 days, the capacity of 1,000 megawatts was not part of the electricity market, which caused further rise of energy prices in Bulgaria.
Equipment maintenance has been performed and the unit has been refueled with fresh nuclear fuel. All the planned activities related to increasing the safety and ensuring the long-term operation of the unit have been carried out. The 5th nuclear power unit of Kozloduy is also operating at full capacity, the power plant's head Nasko Mihov said.
A plasterboard ceiling of a wedding hall came crashing down on top of 150 guests in Kardzhali. Seven people have sustained non-life threatening injuries during the incident which took place on Monday night, among them one child. At the time of the..
A new flare-up of the big wildfire on the Greek side of Slavyanka mountain has crossed the border into Bulgaria, extending the perimeter of the fire over 120 hectares of Bulgarian territory. Heavy bulldozers are making wide clearings so as to..
More than 12,000 music fans are expected to attend the concert of Lenny Kravitz in Burgas. The event at the Marine Station in the coastal city is part of the American rock singer’s Blue Electric Light Tour. The four-time Grammy award winner is..
Bulgaria introduces mandatory disinfection of vehicles at all border crossings because of outbreaks of small ruminant plague in Northern..
Caretaker Prime Minister Dimitar Glavchev stated that he will accept a proposal to be caretaker PM again if President Rumen Radev assigns him this..
The fires in the south-western regions of Bulgaria continue , as more than 15,000 decares of forests have already burned. The battle..
+359 2 9336 661