The planned annual repairs of Unit VI of Kozloduy NPP have been completed five days ahead of schedule. On November 1, at 1.41 am, it joined the country's energy system after an inspection and approval by the Nuclear Regulatory Agency.
The unit was stopped on September 29. For 31 days, the capacity of 1,000 megawatts was not part of the electricity market, which caused further rise of energy prices in Bulgaria.
Equipment maintenance has been performed and the unit has been refueled with fresh nuclear fuel. All the planned activities related to increasing the safety and ensuring the long-term operation of the unit have been carried out. The 5th nuclear power unit of Kozloduy is also operating at full capacity, the power plant's head Nasko Mihov said.
The traditional swim across the Danube River near Silistra will take place at 9:00 am on August 10. Those wishing to participate can register just before the start but must undergo a medical examination and instructions . Dozens of swimmers take part..
Educational, creative and entertaining events await the youngest guests at Stage Central Halls in Sofia. Between 2:00 pm and 5:00 pm on August 7, children will have the opportunity to attend a Children's Coppersmith Workshop (suitable for children..
Caretaker Prime Minister Dimitar Glavchev stated that he will accept a proposal to be caretaker PM again if President Rumen Radev assigns him this position. President of Bulgarian Parliament Raya Nazaryan refuses to be caretaker PM “I..
Bulgaria introduces mandatory disinfection of vehicles at all border crossings because of outbreaks of small ruminant plague in Northern..
Caretaker Prime Minister Dimitar Glavchev stated that he will accept a proposal to be caretaker PM again if President Rumen Radev assigns him this..
The fires in the south-western regions of Bulgaria continue , as more than 15,000 decares of forests have already burned. The battle..
+359 2 9336 661