Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

No risk of artificial rise of prices after adopting the euro

Photo: BGNES

The indicative deadline for the introduction of the euro is January 2024 and five months before this date and a whole year after that, prices in stores would be written in both euros and levs. This will allow us to compare prices in the two currencies. The news has been reported by the Minister of Finance Assen Vassilev. He has presented the plan for the introduction of the single European currency, which has also been published for public discussion.

Vassilev said that there is no risk of an artificial rise in prices after the introduction of the euro in Bulgaria. According to him, the exchange rate of the lev to the euro will remain the same - BGN 1.95583 for 1 euro.

In order to enter into force, the plan must be approved by the National Assembly.


Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Minister of Innovation: There was video surveillance in more than 99.5% of the polling stations

Over 99.5% of Bulgaria's polling stations were covered by video surveillance in the October 27 parliamentary elections. This was stated at a briefing by the Caretaker Minister of Innovation and Growth Rosen Karadimov, appointed by the caretaker..

published on 11/4/24 6:05 PM

17 drifting mines have been destroyed in the Black Sea since the beginning of the war in Ukraine

17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war in Ukraine until today. This was said by Fleet Admiral Velko Velkov at the opening of the Poseidon..

published on 11/4/24 5:45 PM

Bulgaria signs engineering contract for new nuclear capacity with Westinghouse and Hyundai 

An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities and the Westinghouse and Hyundai consortium . Within a year, the engineering design, worth between..

published on 11/4/24 3:14 PM