The trade unions from the state-owned coal-fired power station Martitsa Iztok 2 warn that they will soon initiate protest and strike action to protect the functioning of the power plant.
In an open letter they express concern over the planned transfer of the power station to the free market entirely as the cost price of the electricity it produces is too high. According to the regulatory body the power plant’s selling price is 210 Leva /107 euro/ per Mwh which is 76% higher than the household electricity price, making the electricity produced by Martitsa Iztok 2 non-marketable. The trade unions say that unless steps are taken there is a risk that Martitsa Iztok 2 power station will stop working, leading to an electricity shortage in the region.
Reporting by Juliana Kornazheva, Horizont channel, BNR.
One million and eight hundred Bulgarian citizens travelled as tourists during the third quarter of the year, National Statistical Institute data show. 72.3% of them travelled inside the country, 20.8% travelled abroad and 6.9% - both inside Bulgaria..
“Investing in people, education, innovations and technologies is the key to success in the future,” said President Rumen Radev at the opening of the business forum in Singapore, in which representatives of companies from Bulgaria and Singapore are..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she said she was optimistic about Austria’s decision. Asked what the arguments are for blocking the..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
+359 2 9336 661