The trade unions from the state-owned coal-fired power station Martitsa Iztok 2 warn that they will soon initiate protest and strike action to protect the functioning of the power plant.
In an open letter they express concern over the planned transfer of the power station to the free market entirely as the cost price of the electricity it produces is too high. According to the regulatory body the power plant’s selling price is 210 Leva /107 euro/ per Mwh which is 76% higher than the household electricity price, making the electricity produced by Martitsa Iztok 2 non-marketable. The trade unions say that unless steps are taken there is a risk that Martitsa Iztok 2 power station will stop working, leading to an electricity shortage in the region.
Reporting by Juliana Kornazheva, Horizont channel, BNR.
Romania and Bulgaria have a chance to join the Schengen area by land as of January 2025 , Hungarian Interior Minister Sándor Pinter said after an informal meeting in Budapest of the interior ministers of Hungary, Bulgaria, Romania and Austria ...
The Sofia Christmas Festival will open tonight in the park in front of the National Palace of Culture in the heart of Sofia . The third edition of the festival starts at 6.30 pm with a rich program and attractions - а Ferris wheel, a carousel and..
Yet another, already fifth attempt by MPs to elect a Parliamentary Speaker has failed. Four candidates were put to the vote - Natalia Kiselova from BSP-Unified Left, Petar Petrov from Vazrazhdane, Raya Nazaryan from GERB and Silvi Kirilov from ITN...
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
+359 2 9336 661