Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Power produced by Kozloduy NPP's Unit 6 temporarily halved

Photo: BGNES

Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.

The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Drop in temperatures expected on Sunday

On Sunday, the minimum temperatures will be from 10 to 15°C. In Sofia, it will be around 12°C. A cold front will pass through the country. Cloudiness will be variable, often significant, and from west to east there will be short, temporarily intense..

published on 3/15/25 6:15 PM
PM Rosen Zhelyazkov

Prime Minister says Bulgaria ready to participate in peace and security solution in Ukraine

Europe must continue to plan in a collective and coordinated manner its next steps in ensuring a just and lasting peace in Ukraine . Together with our European and transatlantic partners, Bulgaria is ready to participate in the peace and security..

published on 3/15/25 5:35 PM

ING bank: Changes in the Bulgarian parliament are a new uncertainty for the eurozone

Political stability in Bulgaria continues to be crucial for the adoption of the euro in 2026, writes ING think, the analytical unit of ING bank. The analysis is titled “Monitoring Bulgaria: Euro adoption is looming, but not yet a fact,” BTA reported...

published on 3/15/25 3:35 PM