Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.
The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.
Representatives of the Bulgarian-African Chamber of Commerce visited the Bulgarian Chamber of Commerce and Industry and met with its President Tsvetan Simeonov. Albena Jones, Dimitar Turlakov, and Anton Samsonov are among the founders of..
The Ministry of Foreign Affairs recommends that Bulgarian citizens traveling or residing in Canada keep themelselves well-informed about the current weather conditions, and regularly check the status of their flights. The Canadian Meteorological..
The Ministry of Finance published the 2025 draft budget and the medium-term budget forecast for the 2025-2028 period. The projected deficit for 2025 is up to 6.4 billion BGN (EUR 3.3 billion), which is 3% of GDP. Expenditures will not exceed 40% of..
The latest technological solutions, products and projects in the field of agriculture and agro-industry will be presented at the "Agra..
The Vazrazhdane parliamentary party is organizing a protest on February 22 in front of the Bulgarian National Bank against Bulgaria's entry into the..
The agriculture sector in Bulgaria maintains its stability, providing employment to 6% of the population and forming about 4% of the country's GDP. This..
+359 2 9336 661