An association with lead partner Glavbolgarstroy will have the right to build the section of Struma motorway across Kresna Gorge, the Road Infrastructure Agency has announced.
The cost will be 475 million Leva, VAT excluded. With indirect tax the sum will run to almost 55 million Leva (a little over 28 million euro) per kilometer. This makes the section from Krupnik to Kresna, which is 10.4 kilometers long, the most expensive road section ever built in Bulgaria, BNR’s Marta Mladenova reports. The deadline for the implementation of the project is 4 years 2 months.
The company Glavbolgarstroy was set up more than 50 years ago, and is the first to have developed basic standards in Bulgaria’s contemporary construction industry.
The traffic of trucks in the area of the Danube Bridge at the border with Romania is heavy. This situation is expected to continue over the weekend as the trucks that were waiting at the Kapitan Andreevo crossing at the Bulgarian-Turkish border for..
The truck traffic on the Maritsa highway to the Kapitan Andreevo border crossing at the Bulgarian-Turkish border is now normalized. "As of this morning, there are no more queues of trucks standing on the roadway waiting to cross the border," assured..
At the request of the European Public Prosecutor's Office, searches have been carried out in Sofia, Burgas, Petrich and Rila in connection with an investigation into alleged fraud with EU funds in the restoration of a church. In 2017, a public tender..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
Romania and Bulgaria have a chance to join the Schengen area by land as of January 2025 , Hungarian Interior Minister Sándor Pinter said after an..
+359 2 9336 661