An association with lead partner Glavbolgarstroy will have the right to build the section of Struma motorway across Kresna Gorge, the Road Infrastructure Agency has announced.
The cost will be 475 million Leva, VAT excluded. With indirect tax the sum will run to almost 55 million Leva (a little over 28 million euro) per kilometer. This makes the section from Krupnik to Kresna, which is 10.4 kilometers long, the most expensive road section ever built in Bulgaria, BNR’s Marta Mladenova reports. The deadline for the implementation of the project is 4 years 2 months.
The company Glavbolgarstroy was set up more than 50 years ago, and is the first to have developed basic standards in Bulgaria’s contemporary construction industry.
Romania and Bulgaria have a chance to join the Schengen area by land as of January 2025 , Hungarian Interior Minister Sándor Pinter said after an informal meeting in Budapest of the interior ministers of Hungary, Bulgaria, Romania and Austria ...
The Sofia Christmas Festival will open tonight in the park in front of the National Palace of Culture in the heart of Sofia . The third edition of the festival starts at 6.30 pm with a rich program and attractions - а Ferris wheel, a carousel and..
Yet another, already fifth attempt by MPs to elect a Parliamentary Speaker has failed. Four candidates were put to the vote - Natalia Kiselova from BSP-Unified Left, Petar Petrov from Vazrazhdane, Raya Nazaryan from GERB and Silvi Kirilov from ITN...
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
Romania and Bulgaria have a chance to join the Schengen area by land as of January 2025 , Hungarian Interior Minister Sándor Pinter said after an..
+359 2 9336 661