“Natsionalna Elektricheska Kompania” has sent an invitation to strategic investors for participation in the construction of Belene NPP on a market principle without state guarantees. The call also refers to a declaration of interest in acquiring a minority stake or purchasing electricity produced by the plant, the Ministry of Energy announced. Bulgaria reserves the right to a blocking quota and has in-kind contribution - a licensed construction site, available equipment, issued permits, licenses and other documents related to the project. The deadline for applying is 90 days from the date of publication in the Official Journal of the EU. Expected time for completion of the procedure is 12 months.
After a heated debate, Parliament rejected the proposed GERB-SDS cabinet with Rosen Zhelyazkov as Prime Minister. It was supported by 98 MPs, with 138 voting against and two abstaining. Zhelyazkov, representing the first political force in Parliament,..
Ukrainian optimism clashes with European scepticism ahead of the NATO summit, with divisions emerging over defence spending and how the war will end. These are the conclusions of a report based on a new survey by the European Council on Foreign..
Under the program of the European Civil Protection Mechanism, 240 firefighters from 4 countries arrived in Greece to help their Greek colleagues, the Bulgarian Fire Protection Directorate has reported. Due to the high temperatures..
The Balkans are attracting more and more medical tourists, with Turkiye being the undisputed leader, ranking among the top 10 most preferred countries..
The Movement for Rights and Freedoms (DPS) will immediately return the second government- forming mandate , DPS Co-chairman Delyan Peevski told..
Hungary’s Deputy Interior Minister Bence Retvari stated that the abolition of Bulgaria and Romania’s Schengen borders by land is very important to the..
+359 2 9336 661