Representatives of the Chinese National Energy Administration (NEA) have visited the construction site of the Belene NPP to get acquainted with the equipment already supplied under the project for a second nuclear power plant in Bulgaria.
The guests were welcomed by the Executive Director of the Bulgarian NEK, Petar Iliev, who showed them the measures taken for storing the Russian equipment supplied. The construction site of the power plant is 2500 decares. Necessary roads, a train line, a port and a concrete batching plant were built. The reactor unit and the turbine hall remain to be built, the Ministry of Energy added.
The speculations of a rise in the price of sunflower oil in the coming months due to the poor harvest in the country will not come to pass, Vladimir Ivanov, chairman of the Commodity Exchange and Wholesale Markets State Commission said for the BNR...
A police operation was launched early this morning on the territory of Burgas against vote-buying. The operation aims to guarantee the normal process of voting at the early election for parliament on 27 October. Police are checking private..
Bulgaria is among the leading countries in the number of own homes, and first among 24 countries of Europe, the Deloitte global index shows. According to the data provided by national offices of Deloitte in surveyed countries, Bulgaria has the..
On Sunday a cold atmospheric front will pass through the country. In the morning, the cloudiness will begin to increase rapidly from..
The caretaker government has adopted National Program for Prevention and Protection from Domestic Violence for the period 2024-2026 ,..
Travelling to Israel and staying in the country should be avoided, except in case of emergency, the Bulgarian Ministry of Foreign Affairs said...
+359 2 9336 661