Representatives of the Chinese National Energy Administration (NEA) have visited the construction site of the Belene NPP to get acquainted with the equipment already supplied under the project for a second nuclear power plant in Bulgaria.
The guests were welcomed by the Executive Director of the Bulgarian NEK, Petar Iliev, who showed them the measures taken for storing the Russian equipment supplied. The construction site of the power plant is 2500 decares. Necessary roads, a train line, a port and a concrete batching plant were built. The reactor unit and the turbine hall remain to be built, the Ministry of Energy added.
The Constitutional Court has admitted all five requests for the partial or complete annulment of the elections for the 51st National Assembly, submitted by We Continue the Change-Democratic Bulgaria (PP-DB), Vazrazhdane, There is Such a People (ITN),..
New parking lots with over 1,000 parking spaces, including special areas for people with limited mobility and electric vehicle charging stations, were opened at Sofia Airport today. The parking lots are divided into short-term and..
A Bulgarian businessman has been charged by the European Public Prosecutor's Office with attempted fraud with Chinese agricultural machinery. He tried to present the machinery as Bulgarian-made. A lawsuit has been filed in the Sofia..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
As of next year, use of solid fuels for domestic heating in buildings which are part of central heating and gas supply networks will be banned in nine..
The number of crimes committed in the conditions of domestic violence has gone up by 54% since the beginning of the year compared to last year, the..
+359 2 9336 661