The 5th unit of Kozloduy nuclear power plant has been going under a planned annual maintenance and modernization. The unit will be loaded with fresh nuclear fuel during the maintenance campaign. Some measures aimed at extending the life of the 1,000 megawatt reactor will be also fulfilled. Its thermal power is expected to increase with 4% after the annual maintenance. The maintenance of the 5th reactor at Kozloduy NPP will continue until mid June. Currently the 6th nuclear reactor is functioning at its full capacity.
The Balkan Stream gas pipeline will not be subject to US sanctions for transactions with Russia's Gazprombank. This was revealed in a written answer to a parliamentary question to Energy Minister Zhecho Stankov. On December 23, 2024, the Ministry of..
Bulgaria’s Minister of Foreign Affairs Georg Georgiev met with North Macedonia’s Foreign Minister Timco Mucunski during the Munich Security Conference. Georg Georgiev emphasized that Bulgaria's position regarding the European integration of North..
The weather will be cloudy during the next 24 hours. Snow will fall in the northeastern part of Bulgaria, which will spread to many regions of Northern Bulgaria during the day. It will rain in the southern parts of the country. Snowfall will be..
Bulgaria’s Premier Rosen Zhelyazkov convened an emergency meeting at the Council of Ministers on Saturday dedicated to the issue of food prices...
Bulgaria's Minister of Foreign Affairs, Georg Georgiev, participated in a working breakfast dedicated to addressing illegal migration and its..
Expanding connectivity between Bulgaria and Turkiye is an investment in the development of the entire region, President Rumen Radev said at a meeting..
+359 2 9336 661