Eмисия новини
от 21.00 часа

Greece-Bulgaria gas interconnector can start functioning in test mode at the end of August: ICGB

All principal construction work on the gas interconnector between Bulgaria and Greece via Komotini has been completed. Since mid-June the pipeline equipment has been filled and tested successfully with compressed natural gas. The gas pipeline, the..

12.08.22 11:31 |
Radan Kanev

Radan Kanev asks European Commission whether gas interconnector with Greece is being deliberately delayed

Bulgarian MEP Radan Kanev has asked the European Commission whether it was monitoring the finalization of the project for the Greek-Bulgarian gas interconnector and whether the governments of Bulgaria and Greece have provided explanations for the..

10.08.22 19:21 |
Hristo Alexiev

Gas interconnector with Greece becomes top priority

The entire country is currently working to complete the gas connection with Greece, Deputy Prime Minister and Minister of Transport, Hristo Alexiev, said. Together with the Minister of Regional Development and Public Works, Ivan Shishkov, he..

10.08.22 17:40 |

Peach producers: Imports from Greece are killing the local production

Peach producers from the region of Sliven (central Bulgaria) have threatened with effective protest actions because of the low purchase prices of peaches. According to them, imports from Greece are killing the local business, so they want the state to..

10.08.22 15:38 |

The interconnector with Greece might not be made operational by 1 November, Bulgargaz CEO says

“The problem with the second gas interconnector between Greece and Bulgaria is the unfinished construction work. We are expecting a day-to-day timetable of performance of the works from the builder,” caretaker Minister of Regional Development and..

09.08.22 14:05 |
Caretaker Minister of Regional Development Ivan Shishkov

The gas interconnector with Greece will be given preferential treatment in the highest degree, caretaker regional development minister says

“The gas interconnector Greece-Bulgaria will be given preferential treatment in the highest degree so that it can be made operational as soon as possible,” caretaker Minister of Regional Development architect Ivan Shishkov said at a technical..

08.08.22 12:26 |

Balkan developments

Montenegro's government faces no-confidence vote over agreement with Serbian church A number of government coalition parties, led by the Democratic Party of Socialists (DPS) of President Milo Đukanović, announced a no-confidence motion in..

05.08.22 16:28 |

Bulgaria and Greece could build second pipe for Azeri gas: ICGB Executive Officer

“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora..

31.07.22 12:51 |

Balkan Developments

Croatia unveils the Peljesac Bridge Croatia unveiled the Peljesac Bridge connecting the southern Adriatic coast to the rest of the country, hina.hr reported. The facility costs EUR 525 million. Peljesac Bridge is the largest..

29.07.22 14:31 |

Outgoing PM Kiril Petkov: Greece-Bulgaria gas interconnector now has Act 14, will have formal authorization for use by end-August

Outgoing Prime Minister Kiril Petkov announced, at a briefing, that the gas interconnector Greece-Bulgaria, which will be used to transport gas from Azerbaijan to Bulgaria, now has Act 14 (the first step of control of construction works) , and that..

29.07.22 14:14 |
Всички новини: днес | вчера

Горещи теми

Войната в Украйна