On Wednesday 30 April, between 8am and 5pm, traffic on the Danube bridge near Ruse will be stopped periodically at short intervals, the Road Infrastructure Agency (RIA) announced. The temporary restriction is due to asphalt paving work on a closed 413 metre section in the direction of Romania. During the works, traffic will be directed by flaggers and border police teams.
The major refurbishment of the facility is progressing on schedule. The project is scheduled for completion in summer 2026.
A delegation comprising MPs from Vazrazhdane party arrived in Moscow on Sunday. The delegation is led by Tsoncho Ganev, Deputy Chairman of Vazrazhdane and Deputy Chairman of the Bulgarian National Assembly, Georgi Georgiev, Deputy Chairman of..
The second F-16 fighter jet is expected to arrive in Bulgaria within days, said Defense Minister Atanas Zapryanov during a lecture to students at the University of Library Studies and Information Technologies. PM Rosen Zhelyazkov: The first..
Bulgaria’s President Rumen Radev discussed ways to boost trade and investment between Bulgaria and Poland during a meeting with representatives of the Polish-Bulgarian Chamber of Commerce. On the first day of his visit to Warsaw, President..
Bulgaria’s President Rumen Radev discussed ways to boost trade and investment between Bulgaria and Poland during a meeting with representatives of..
A month after Bulgaria receives the green light to join the eurozone, all traders are obliged to have their prices in both Bulgarian..
Since the beginning of the year, Bulgaria has also met the price stability criterion for eurozone membership, Minister of Finance..
+359 2 9336 661