One of the key steps in the expansion of the underground gas storage at Bulgaria's Chiren gas storage facility, the construction of the above-ground infrastructure and the installation of new compressors, has already been completed, Energy Minister Zhecho Stankov said in an interview with Bulgarian National Television. Minister Stankov explained that this will allow larger quantities of natural gas to be pumped at a lower cost during the spring and summer seasons.
A permit of use has already been issued for the compressors. The expansion will increase Chiren's current capacity of 550 million cubic metres by 20%. The Minister pointed out that this would guarantee the country's energy security.
Regarding the investigation by the European Public Prosecutor's Office (EPPO) into the expansion of the gas storage facility, all the information requested had been provided to dispel any doubts, Zhecho Stankov added.
He added that Bulgaria would be the first country to start actual construction of the Vertical Gas Corridor - an infrastructure project linking Greece, Bulgaria and Romania. The first phase covers a 48-kilometre stretch from the Greek border at Kulata to Kresna in south-western Bulgaria, allowing capacity to be increased from 2.3 to 3.6 billion cubic metres.
A Bulgarian-Greek Business Forum with the participation of nearly 60 companies from both countries has opened today in Sofia . The forum is organized by the Bulgarian-Greek Chamber of Commerce and Industry and the Bulgarian Chamber of Commerce and..
Bulgaria has favorable climatic conditions for producing electricity from the su n, even in the transitional seasons of spring and autumn. One of the cities with the best conditions for using photovoltaic systems is Dupnitsa. The southwestern..
In 2024, the average gross annual salary in Bulgaria is 27,881 BGN (EUR 14,255), according to preliminary data from the National Statistical Institute. Compared to 2023, this marks an increase of 13.9% , with the public sector seeing an increase of..
+359 2 9336 661