Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

Photo: kznpp.org

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve safety, the reactor was refueled with fresh nuclear fuel. 

The unit's load will be gradually increased as required.

Unit 5 of the Kozloduy NPP is operating normally.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Boyko Borissov

GERB says it will only hold negotiations with the participation of party leaders on the formation of a cabinet

“ There will only be negotiations among party leaders if they are for the formation of a ruling majority and a regular government,” GERB party declared at a briefing after a meeting of GERB’s executive commission, in regard to a possible meeting..

published on 11/25/24 1:05 PM

Homeless people in Ruse to receive a free hot meal

For the 13th consecutive year, homeless people in the town of Ruse will receive a free hot meal during the winter months. The social kitchen of the Bulgarian Red Cross opens its doors again in the biggest Bulgarian city on the Danube River. It has a..

published on 11/25/24 12:02 PM

Ministry of Transport proposes the division of railway routes into three lots

Experts from the Ministry of Transport and Communications are proposing the division of Bulgarian State Railways (BDZ) into three lots. According to them, this is a first step toward a more efficient and modern railway transport system, reported..

published on 11/25/24 11:48 AM