An engineering contract for the construction of new nuclear facilities at Site No. 2 of the Kozloduy NPP will be signed today with Hyundai and Westinghouse.
According to caretaker Minister of Energy Vladimir Malinov, the contract will enable, within 12 months of its signing, to have "a precise schedule, a fixed price for the implementation of the project, predictability at what price the new capacities will produce energy and whether it will be profitable and affordable for the Bulgarian society and for the whole region".
The ceremony in the Council of Ministers will be attended by caretaker Prime Minister Dimitar Glavchev, US Ambassador Kenneth Merten, the Head of Mission of the Embassy of the Republic of Korea, ministers and other officials.
Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..
The Institute for Computer Science, Artificial Intelligence and Technology at Sofia University "St. Kliment Ohridski has made available for free use the..
Rumen Radev's visit to Vietnam began with a meeting with the community of Vietnamese citizens who have studied and worked in Bulgaria - representatives..
The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana..
+359 2 9336 661