In the early hours of October 19, 2024, Unit 6 of the Kozloduy NPP will be shut down for planned annual maintenance that is expected to last until the end of November. During this time, the planned repair works and recharging of the reactor with fresh nuclear fuel will be carried out.
The fifth power unit of the Kozloduy NPP operates according to the electricity production schedule, it was reported.
Bulgaria has one nuclear power plant - Kozloduy NPP, which has two operating units - No. 5 and No. 6. Nuclear energy provides about 40% of the country's gross electricity production.
Tonight, the cloud cover will be significant, with rain expected in parts of the western half of the country—more substantial in the central regions. The lowest temperatures will range between 6°C and 11°C, around 9°C in Sofia. On Saturday,..
Thirteen people were arrested in central Sofia during a specialized police operation aimed at countering illegal migration and preventing crimes committed by or against foreign nationals. The operation took place on April 16 and 17, said the Ministry..
Blind ultrarunner Victor Asenov has officially become part of the Everesting Hall of Fame, Sportal.bg reports. Between March 21 and 23, the ''Invictus'' Victor Asenov completed 19 consecutive ascents from Aleko Hut to Cherni Vrah Mount on..
Together with PM Rosen Zhelyazkov we discussed the EU plan for a new Black Sea strategy which the European Commission will present soon, announced EU..
In an interview with public service TV BNT, Commissioner for Enlargement Marta Kos, who is on a working visit to Bulgaria, stated that Ukraine and the..
Half of the companies from the Bulgarian Industrial Capital Association say that the tariffs on the import of commodities announced by US President..
+359 2 9336 661