In Brussels, Bulgaria and North Macedonia reaffirmed their commitment to continue the construction of Railway Corridor No. 8 under the TEN-T Regulation, reported the European Commission’s Directorate General for Neighborhood Policy and Enlargement Negotiations.
This was the outcome of a high-level meeting between Bulgaria’s Deputy Minister of Transport and Communications Biser Minchev, Stefan Volkanovski, State Secretary at North Macedonia's Ministry of Transport, Sinisha Ivanovski, Director of Railway Infrastructure in North Macedonia, representatives of the European Commission, the European Investment Bank, the European Bank for Reconstruction and Development and the Transport Community Secretariat.
The two countries agreed to hold a regular high-level dialogue and establish a joint working group for Corridor No. 8, and to find a coordinated technical solution for the construction of the cross-border section of the Corridor, BTA reported.
The final price proposed by Bulgargaz for the sale of natural gas to its customers in October is BGN 63.72 (EUR 32.58) per megawatt-hour before tax. The 3% price increase is expected to be approved by the Energy Regulatory Commission. The October price..
T he LNG terminal near the Greek town of Alexandroupolis has officially srarted commercial operations today, the Greek company Gastrade announced. The facility features state-of-the-art technology with a maximum regasification capacity of 5.5 billion..
In September, the overall Business Climate Indicator for the country decreased by 1 point compared to August. The decline reflects a less favourable assessment in the industry sector, where the indicator fell by 5.2 points. Managers in industry reported..
A Taiwanese technology giant is negotiating to build a large production facility on the territory of the Trakia Economic Zone near Plovdiv, announced..
+359 2 9336 661