On October 4, 1974, the construction of the Hemus Motorway from Sofia to Varna started. Back then, the chairman of the State Council and leader of the Bulgarian Communist Party, Todor Zhivkov, turned the first sod for the country's northern transport axis. This was also the start of construction of the motorway ring in Bulgaria. The main designer of the route is engineer Dena Palankova, BTA recalls.
By 1985, the difficult section with numerous tunnels and bridges passing through the Vitinia Pass was completed. The highest viaduct in Bulgaria (120 meters) is situated in this section. The planned length of the highway route is 418 km, which makes "Hemus" the longest motorway in Bulgaria, but currently 191 km are completed and in use. A new 7 km-long section is soon to be put in use.
In Brussels, Bulgaria and North Macedonia reaffirmed their commitment to continue the construction of Railway Corridor No. 8 under the TEN-T Regulation, reported the European Commission’s Directorate General for Neighborhood Policy and Enlargement..
A Taiwanese technology giant is negotiating to build a large production facility on the territory of the Trakia Economic Zone near Plovdiv, announced caretaker Minister of Innovation and Growth Rosen Karadimov. He was briefed with the progress of the..
A Japanese-Bulgarian business forum is being held in Sofia, organized jointly by the Japan External Trade Organization (JETRO ) and the Bulgaria Invest Agency . "I am leading a delegation of a hundred people, a fact that speaks volumes about..
+359 2 9336 661