Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

New procedure under Recovery and Resilience Plan provides access to over BGN 1 billion for businesses

Photo: pixabay

The procedure for renewable electricity storage projects under the National Recovery and Resilience Plan is now open and proposals are being accepted. There is a lot of money, the deadlines are short and the conditions applicants have to meet are not small at all.

The measure is known as RESTORE and is part of the Low Carbon Economy section of the National Recovery and Resilience Plan. Its aim is to enable a significant increase in the share of renewable energy in the country's energy mix, while also building the necessary infrastructure to store it.

The investment will support the construction and commissioning of a national infrastructure of renewable energy storage facilities with a capacity of at least 3,000 MWh.

The budget of the long-awaited measure is more than BGN 1.15 billion, which can benefit small, medium and large enterprises.

The deadline for submitting proposals for the implementation of the investment is 21 November.

The investment must be implemented by 31 March 2026 at the latest. More information on the topic and how to apply can be found HERE.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Fitch Ratings: Sofia could be ready to adopt the euro in early 2025

International rating agency Fitch Ratings has affirmed Bulgaria's long-term foreign and local currency credit rating at BBB with a positive outlook, the Finance Ministry said. The positive outlook reflects the country's prospects for eurozone..

published on 10/19/24 1:43 PM

After data update, Bulgaria's GDP for 2023 has increased

In 2023, Bulgaria's GDP growth was 1.9% higher in real terms compared to 2022. This is 0.1 percent more than the initially announced growth of 1.8%, the National Statistical Institute has reported.  The chairman of the institute,..

published on 10/18/24 1:30 PM

Bulgaria and North Macedonia reaffirm their commitment to continue the construction of Railway Corridor No. 8

In Brussels, Bulgaria and North Macedonia reaffirmed their commitment to continue the construction of Railway Corridor No. 8 under the TEN-T Regulation, reported the European Commission’s Directorate General for Neighborhood Policy and Enlargement..

published on 10/17/24 8:40 AM