Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Military personnel have been taking part in the efforts to extinguish wildfires in all parts of the country

Photo: BTA

Around 2,120 military personnel from different land forces units have taken part in the efforts to put out wildfires in different parts of the country since 12 July this year, the Ministry of Defence has announced. Some of them are still working in the field alongside military from the air force, firefighters from the Fire Safety and Civil Protection directorate general, forest rangers and volunteers.  

There are 18 military personnel from the 3rd brigade command with 6 specialized machines currently taking part in the efforts to extinguish the fire in Slavyanka mountain on the Bulgarian-Greek border which started 22 days ago. A total of 135 fires have been extinguished during the past 24 hours alone, in which one person has been injured, the Fire Safety and Civil Protection directorate general reports. Firefighters have reacted to 176 reports.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM