The European Commission has approved state aid amounting to EUR 142 million (BGN 278 million) to support the energy sector, BNR’s correspondent in Brussels reports. The money is being granted to alleviate part of the expenses of the companies which filled the underground gas storage facility Chiren, in November 2022, to 80% before the start of the heating season. The aid will be in the form of direct grants to the natural gas suppliers to compensate for part of their losses sustained as a result of the storage of expensive gas in the summer of 2022 with the aim of fulfilling the country’s obligation to store and subsequently sell it at lower prices from November 2022 to April 2024. The ceiling for the aid is EUR 76.7 per MWh. In calculating the final amount of state aid, only half of the stored gas can be taken into account. The scheme will be in force until the end of this year.
The truck traffic on the Maritsa highway to the Kapitan Andreevo border crossing at the Bulgarian-Turkish border is now normalized. "As of this morning, there are no more queues of trucks standing on the roadway waiting to cross the border," assured..
At the request of the European Public Prosecutor's Office, searches have been carried out in Sofia, Burgas, Petrich and Rila in connection with an investigation into alleged fraud with EU funds in the restoration of a church. In 2017, a public tender..
One million and eight hundred Bulgarian citizens travelled as tourists during the third quarter of the year, National Statistical Institute data show. 72.3% of them travelled inside the country, 20.8% travelled abroad and 6.9% - both inside Bulgaria..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07..
+359 2 9336 661