Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Major repairs to Danube bridge at Ruse begin

Photo: Ruse Regional Administration

Major repairs to the Danube bridge at Ruse begin on 10 July, the Road Infrastructure Agency has announced. 

The work will be carried out daily during daylight hours for 10-12 hours a day, depending on the specific work to be carried out, and there will be no complete closure of the road. Vehicles will travel in both directions and will pass through the lane that is not being worked on. 

The work will be carried out in six phases. In the first two, the main repair of the overpass on Bulgarian territory will be carried out and a section of about 400 metres will be closed to allow the work to be carried out. Traffic will be restricted first in the lane leading to Bulgaria and then in the lane leading to Romania. The estimated time for completion of the repair work on this section is approximately four and a half months for each lane.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

President Radev calls for stronger EU security and urges North Macedonia to implement Consensus 2022

Addressing the crises facing the EU requires strengthening Europe's global competitiveness and ensuring security, President Rumen Radev said during a meeting with European Council President António Costa at the Munich Security Conference...

published on 2/16/25 10:39 AM
Support for protesting Serbian students in Pirot.

Bulgarians and Serbs from Tsaribrod and Pirot support student protests

Bulgarians and Serbs from the towns of Tsaribrod and Pirot marched in support of the student protests in Serbia , reports BTA. "We want the students' demands to be met and we hope that there will be changes in Serbia," demonstrators from the two towns in..

published on 2/16/25 10:27 AM

Balkan Stream pipeline exempted from US sanctions on Gazprombank transactions until March 2025

The Balkan Stream gas pipeline will not be subject to US sanctions for transactions with Russia's Gazprombank. This was revealed in a written answer to a parliamentary question to Energy Minister Zhecho Stankov. On December 23, 2024, the Ministry of..

published on 2/16/25 9:45 AM