The scheduled annual maintenance of Unit 5 of the Kozloduy Nuclear Power Plant has been completed, the plant announced. The unit was reconnected to the national electricity grid at 9:53 AM following an inspection and a positive assessment by the Bulgarian Nuclear Regulatory Agency.
BTA recalls that Unit 5 of the Kozloduy NPP was shut down for scheduled annual maintenance and refueling with nuclear fuel on May 5. As part of Kozloduy NPP's programme to diversify nuclear fuel supplies, 43 fuel assemblies manufactured by Westinghouse were loaded into the reactor. This marks the beginning of a four-year process of Unit 5's phased transition to RWFA nuclear fuel.
The truck traffic on the Maritsa highway to the Kapitan Andreevo border crossing at the Bulgarian-Turkish border is now normalized. "As of this morning, there are no more queues of trucks standing on the roadway waiting to cross the border," assured..
At the request of the European Public Prosecutor's Office, searches have been carried out in Sofia, Burgas, Petrich and Rila in connection with an investigation into alleged fraud with EU funds in the restoration of a church. In 2017, a public tender..
One million and eight hundred Bulgarian citizens travelled as tourists during the third quarter of the year, National Statistical Institute data show. 72.3% of them travelled inside the country, 20.8% travelled abroad and 6.9% - both inside Bulgaria..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus..
The Institute for Computer Science, Artificial Intelligence and Technology at Sofia University "St. Kliment Ohridski has made available for free use the..
+359 2 9336 661