Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Implementation of the Vertical Gas Corridor has started

Photo: government.bg

In Sofia, two agreements have been signed for the construction of parts of the Vertical Gas Corridor, which has given a start to the actual activities aimed at increasing the capacities between Greece, Bulgaria and Romania. 

After the completion of the project, the Bulgarian gas transmission infrastructure will be able to supply additional quantities of liquefied natural gas from reliable sources, including the USA, Azerbaijan, Egypt and others. The project is a joint one between Bulgaria, Greece, Romania, Hungary, Slovakia, Ukraine and Moldova and aims to increase the security and diversification of sources and routes for transferring additional quantities of natural gas from south to north. The corridor is expected to be completed in late 2025.

At the end of this year, it is expected that the transfer of Russian gas through Ukraine would be stopped.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Delyan Peevski says he can form a cabinet if given the opportunity

The leader of “МРФ – New Beginning” Delyan Peevski has expressed his readiness to take the post of prime minister. “When we are the first party, I will form a government,” he said on the sidelines of the National Assembly. “If the Bulgarians give..

published on 11/28/24 2:51 PM
Boyko Borissov

Boyko Borisov: There is no chance for GERB-SDS, PP-DB, BSP-United Left and ITN to form a cabinet

The chairman of GERB Boyko Borisov once again stated that the winning formula for forming a regular government is for it to be supported by GERB-SDS, “We Continue the Change – Democratic Bulgaria”, “BSP – United Left” and ITN. However, he clarified that..

published on 11/28/24 2:42 PM

Between 80 and 90% of water for domestic and industrial needs is lost in Bulgaria's water transmission network

Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this occasion, Caretaker Environment Minister Petar Dimitrov called for work to improve and repair the water..

published on 11/28/24 2:15 PM