Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Kozloduy NPP Unit 5 shut down for refuelling

Photo: Kozloduy NPP

Unit 5 of the Kozloduy Nuclear Power Plant (NPP) has been temporarily shut down for its scheduled annual maintenance and refuelling, which is expected to last until mid-June this year, the plant's authorities have confirmed.

As part of Kozloduy NPP's diversification initiative, the reactor is loaded with fuel cartridges manufactured by the US company Westinghouse.

During each annual refuelling period, a quarter of the cartridges in the reactor will be replaced. This strategic approach will ensure a gradual transition to the new nuclear fuel over a total period of four years.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Hot Monday with temperatures up to 37°C; short-term precipitation in some places

The night sky will be mostly clear with more clouds until midnight in the western areas of the country where rain showers are possible. On Monday, June 24, the weather will be mostly sunny. In the south-western regions of Bulgaria, cumulus..

published on 6/23/24 6:25 PM
Lena Borislavova

PP-DB: There is no way we can interact with ITN, GERB and DPS

PP-DB will not support a cabinet with the first mandate of GERB-SDS, nor with the second mandate (DPS), or the third, which "certainly would not be expert and independent". "There is no way we could enter into interaction with ITN,..

published on 6/23/24 5:31 PM

Daily flights between Sofia and Burgas during the summer starting in July

The national air carrier "Bulgaria Air" resumed its regular flights between Sofia and Burgas, BNR Burgas has reported. Regular daily flights start on July 1 and there will be daily transport until September 8, except on July 3,..

published on 6/23/24 4:25 PM