Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Ex-director of National Customs Agency Petya Bankova remains permanently in custody

Photo: BGNES

The Sofia Court of Appeal has permanently remanded the former head  of the National Customs Agency Petya Bankova and businessman Stefan Dimitrov in custody. The decision is not subject to appeal.

According to the reasons of the judges, there is a well-founded assumption that the two are part of an organized criminal group, to which the former chief secretary of the Ministry of the Interior, Zhivko Kotsev, was joined yesterday.

Petya Bankova has also been charged with coercion, her lawyer Adelina Natina announced.

On April 4 of this year Petya Bankova was detained for 72 hours and accused of participating in an organized crime group with trading in influence, smuggling, bribery with three other people, including Stefan Dimitrov.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Education minister Krasimir Valchev

Bilingual children returning from abroad should have additional Bulgarian lessons

The Bulgarian education system and the law on preschool and school education do not provide for the so-called language integration , Minister of Education Krasimir Valchev admitted to the relevant parliamentary committee. According to him, this means..

published on 3/21/25 1:28 PM
Radostin Vasilev

MECH are threatening with blockades and protests if their parliamentary group is not recognized

If there is no parliamentary group of the ''Morality, Unity, Honor'' party (MECH) on March 26, we will start blockades, said MECH leader Radostin Vassilev at a press conference. He demanded the resignation of National Assembly Speaker Natalia..

published on 3/21/25 12:04 PM

The construction of the Shipka tunnel may begin by the end of 2025

Another major infrastructure project in Bulgaria is moving forward. The technical project for the construction of the tunnel under Mount Shipka will be ready this year. If approved, the construction of the facility will begin as early as 2025,..

published on 3/21/25 11:39 AM