Natsionalna Elektricheska Kompania (NEK) together with Romanian company Hidroelectrica has been updating a project for a hydroelectric power plant on the Danube River, situated between Nikopol and Turnu Măgurele, Minister of Energy Rumen Radev has told journalists in the Belmeken power plant. The idea of a power plant on the Danube with the construction of a dam that would also serve as a bridge is more than half a century old, investor.bg recalls.
Hidroelectrica has two such plants together with Serbia, and the company’s experience can be applied here as well, according to NEK. The work is still at a very early stage and the supposed cost of the project is about 6 billion euros for both countries, Georgiev said.
In the past the project was frozen, as the lower level of the Romanian coast could mean flooding of large areas and small islands.
Bulgaria is making good progress toward joining the Eurozone, as inflation is decreasing towards the threshold set by the criteria, European Bank for Reconstruction and Development President Odile Renaud-Basso said in an interview with BTA. The..
Bulgaria's Ministry of Transport has been working for years to develop Corridor No. 8, connecting the Adriatic with the Black Sea through Albania, North Macedonia and Bulgaria. Of the 1,220 km of railway line along the corridor, 747 km are on the..
A little less than a month ago, Minister of Finance Temenuzhka Petkova presented, in Brussels, the headway Bulgaria has made along the road to joining the Eurozone. There, she stated that with its prudent fiscal policy, the country had earned its..
Property prices on the Black Sea coast have risen by 20%, Nova TV reported, citing major real estate agencies in the Burgas region. Most of the buyers..
Bulgaria can be a strategic partner of Japan for the region of Eastern and Central Europe. This was stated by Bulgarian President Rumen Radev as he..
+359 2 9336 661