The rehabilitated 5th unit of the Belmeken Pumped Storage Hydro Power Plant (Belmeken PSHPP) has officially been opened by Prime Minister Nikolai Denkov and Energy Minister Rumen Radev, public service TV BNT reports.
The project is worth EUR 10 million, 70% of which from the Kozloduy fund, and manager of the programme is the European Bank, Minister Radev said. The first two units were made operational in 2022, another 2 - in 2023, and the last unit is being made operational now. In the past few years the role of these facilities has surpassed the expectations of the people who built them, and pumped storage hydro power plants are now part of the flexibility of our energy system, PM Denkov stated further.
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would lift its veto and that Bulgaria and Romania would probably become full members of Schengen from the..
The Institute for Computer Science, Artificial Intelligence and Technology at Sofia University "St. Kliment Ohridski has made available for free use the..
Rumen Radev's visit to Vietnam began with a meeting with the community of Vietnamese citizens who have studied and worked in Bulgaria - representatives..
The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana..
+359 2 9336 661