Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Rotation of prime ministers should be done as quickly and smoothly as possible

Photo: gov.bg

Not later than March 6, the cabinet must have resigned so that the new one with Prime Minister Mariya Gabriel can take office as quickly as possible, said Prime Minister Nikolai Denkov, who is in Davos for participation in the World Economic Forum. According to him, the rotation is a purely technical matter and it should be carried out as quickly and smoothly as possible. Making changes in the cabinet cannot be an end in itself, Denkov pointed out.

I never asked for the resignation of the Minister of Interior Affairs, the PM also said. Speaking about the Minister of Defense he commented that the fact that there is criticism is not a reason to ask for his replacement.

Speaking about the World Economic Forum in Davos, Denkov pointed out that the title of this year's meeting - "Rebuilding Trust", means that societies must return to their common goals.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM