The Road Infrastructure Agency has launched a public procurement for the development of a conceptual design for the Montana-Sofia expressway with a tunnel under the Petrohan Pass. The length of the section is 82 km and the design speed is 120km/h. The indicative value of the design contract is EUR 3.3 million.
Until February 15 next year, offers will be accepted for the development of an extended conceptual design, complete engineering and geological studies and a detailed spatial plan for the expressway connecting the Montana bypass and the Sofia ring road. The task is to avoid crossing protected areas and to comply with all requirements in the Environmental Protection Act. The implementation deadline is 365 calendar days. The Sofia-Montana expressway with a tunnel under the Petrohan Pass is key to the national and the European transport network.
Social Minister Borislav Gutsanov will attend an open lesson today at the Alexander Pushkin Secondary School in Varna, organized by the State Agency for Child Protection. The event is part of the campaign that informs children..
On Monday, it will be mostly cloudy over most of the country and in some places it will rain. The lowest temperatures will be between 4° and 9°C; in Sofia - about 6°C. The highest will be between 13° and 18°C, slightly lower along..
“I am deeply saddened by the news of the horrific missile attack on the center of the city of Sumy on Palm Sunday,” Prime Minister Rosen Zhelyazkov wrote on the social network X. The Prime Minister expressed empathy for the..
Five out of seven paediatricians at the capital's Fifth Multiprofile Hospital for Active Treatment "Knyaginya Klementina" have submitted their resignations..
Public transport workers in Sofia, Varna and Ruse took to the streets of the capital under the slogan “Decent work – decent pay! Without transport there..
Bulgarians, especially young people, need to understand that it is essential to have an employment contract to protect their labour rights, Labour and..
+359 2 9336 661