The Road Infrastructure Agency has launched a public procurement for the development of a conceptual design for the Montana-Sofia expressway with a tunnel under the Petrohan Pass. The length of the section is 82 km and the design speed is 120km/h. The indicative value of the design contract is EUR 3.3 million.
Until February 15 next year, offers will be accepted for the development of an extended conceptual design, complete engineering and geological studies and a detailed spatial plan for the expressway connecting the Montana bypass and the Sofia ring road. The task is to avoid crossing protected areas and to comply with all requirements in the Environmental Protection Act. The implementation deadline is 365 calendar days. The Sofia-Montana expressway with a tunnel under the Petrohan Pass is key to the national and the European transport network.
Citizens of Sofia gathered for a protest once again today in memory of 12-year-old Siyana, who died in a car accident. Mass demonstrations continue across the country against the deadly behaviour of drivers on the Bulgarian roads...
Patriarch Daniil has served a Holy Liturgy in the Cathedral of St. Alexander Nevsky on the occasion of the Feast of the Entrance of the Lord into Jerusalem. After raising Lazarus from the dead, the Son of God went to..
At an official ceremony to welcome the first Bulgarian F-16 Block 70 fighter jet at the 3rd Air Base in Graf Ignatievo, Prime Minister Rosen Zhelyazkov pointed out that the new plane symbolizes the ideological change that began in..
The delivery of the F-16 fighter jets is just the beginning of the political commitment to logistics, maintenance and the development of real..
The military research vessel RSV 421 "Sts Cyril and Metodius" has returned to Bulgaria after successfully completing its third mission to Antarctica...
On Sunday, the lowest temperatures will range between 1°C and 6°C, around 2°C in Sofia. During the day, it will be mostly sunny, with temporary..
+359 2 9336 661