Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Finance Minister Vassilev: EUR 6 billion guarantee the construction of Romania-Bulgaria-Greece motorway

MinisterVassilev at the international Southeast Europe Connectivity Forum
Photo: BTA

 “The North-South connection plays a key role for the sustainable infrastructure and connectivity in Southeastern Europe via the construction of a motorway linking Greece with Romania via Bulgaria. We are hoping the procedures will be concluded as soon as possible and the project will be completed within 5 years,” said Bulgaria’s Finance Minister Assen Vassilev at an international Southeast Europe Connectivity Forum in Thessaloniki. “With the motorway providing an outlet for Bulgarian ports to the Mediterranean, connectivity will be completely fully,” Minister Vassilev explained and added that the old road connecting the Northern countries via the Balkans ran between Vienna and Istanbul, and that today a new North-South connection to the Mediterranean is needed. A EUR 6 billion guarantee is set down in the budget for this corridor, a contractor is expected to be selected to handle the construction work, Assen Vassilev said.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Sofia Christmas festival will kick off tonight in front of National Palace of Culture

The Sofia Christmas Festival will open tonight in the park in front of the National Palace of Culture in the heart of Sofia . The third edition of the festival starts at 6.30 pm with a rich program and attractions - а Ferris wheel, a carousel and..

published on 11/22/24 4:24 PM

MPs fail to elect a Speaker of Parliament at fifth attempt

Yet another, already fifth attempt by MPs to elect a Parliamentary Speaker has failed. Four candidates were put to the vote - Natalia Kiselova from BSP-Unified Left, Petar Petrov from Vazrazhdane, Raya Nazaryan from GERB and Silvi Kirilov from ITN...

published on 11/22/24 3:40 PM

Heavy traffic of truck near Danube Bridge at the border with Romania

The traffic of trucks in the area of the Danube Bridge at the border with Romania is heavy.  This situation is expected to continue over the weekend as the trucks that were waiting at the Kapitan Andreevo crossing at the Bulgarian-Turkish border for..

published on 11/22/24 3:36 PM