Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Kozloduy NPP's Unit 6 switched off for scheduled annual maintenance

Photo: BGNES

Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.

The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Demolition of illegal Roma settlement underway in Sofia

In Sofia's Zaharna Fabrika neighbourhood, in the Ilinden municipality, the authorities have begun demolishing illegal structures inhabited by members of the Roma community. The municipality assures full cooperation with the citizens. The demolition..

published on 4/15/25 3:47 PM

Bulgaria reaps success at EXPO 2025 in Japan

Having made a triumphant return to EXPO 2025 in Osaka, Japan, after 55 years, Bulgaria's pavilion at the world expo is enjoying huge interest. "The investment interest of Japanese entrepreneurs shows that we are on the right track," said Deputy..

published on 4/15/25 3:05 PM
Minister of Finance Temenuzhka Petkova

Finance Minister Petkova confirms Bulgaria's readiness for eurozone integration

Finance Minister Temenuzhka Petkova has announced that Bulgaria is ready to join the eurozone. She made the statement at a business breakfast hosted by the American and British Chambers of Commerce in Bulgaria. Minister Petkova emphasised that Bulgaria..

published on 4/15/25 1:37 PM