Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Workers in the largest Bulgarian energy complex are protesting

| updated on 9/28/23 12:25 PM

Miners, energy workers and trade union representatives at TPP "Maritsa East 2" and "Mini Maritsa East" refused to talk to the Deputy Minister of Energy for the Territorial Plan of Stara Zagora. They asked for another month to discuss the plan because it was published on September 27.

The protest of workers was held in front of the Cultural Center in Radnevo, where a meeting was planned to take place between trade union leaders and representatives of the Ministry of Energy and the Ministry of Regional Development. The talks come ahead of the government meeting on September 29 on adopting the Just Transition Plan in the coal regions. "We cannot discuss Bulgaria's energy strategy in a single day," the regional chairman of the CITUB trade union Deyan Dyakov, said. Workers do not agree with the proposed Territorial Plans. They consider them vague and insist that the plans include concrete measures to create new jobs in the region and to extend the production of electricity from coal, he added.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM