Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Servicepersons to help Tsarevo Municipality recover from the floods

| updated on 9/7/23 11:34 AM
Photo: BGNES

The Bulgarian Army is starting to work on the spot to help Tsarevo Municipality overcome the damage from the floods, Fleet Admiral Velko Velkov said for bTV. 20 servicepersons and heavy equipment have already arrived in the area. They will help with logistics and the restoration of facilities.

According to Tsarevo Mayor Georgi Lapchev, the situation is currently calm, but the two municipal dams are being constantly monitored. In his words, they were intact at the time of the disaster which prevented more serious damage and more casualties.

A metal bridge is to be built in Tsarevo today. There is water and electricity in all settlements in Tsarevo Municipality.

Emergency teams have drained all the houses for which an alert has been issued, said Chief Commissioner Alexander Dzhartov, Director of the General Directorate Fire Safety and Civil Protection. Drainage of hotels and garages continues. Work is also underway on one of the dams to prevent the water level from rising.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM