Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Accelerated schedule for the construction of third reactor at Bulgaria's Kozloduy NPP

Photo: kznpp.org

Westinghouse Electric has signed a contract with Kozloduy NPP - New Capacities a contract for preliminary engineering activities for the construction of a new reactor using the AP1000 technology at the site of the Bulgarian nuclear power plant. 

The contract foresees an assessment of the possibilities for integrating the Bulgarian industry in the project for the construction of a new nuclear capacity with American technology and for the maximum use of the existing infrastructure at the Kozloduy NPP site. 

Two reactors with Russian BBEP-1000 technology are currently operating at the site and there is a foundation for a third reactor.

The joint task force has already begun evaluating regulatory, licensing and design requirements and is developing an accelerated work schedule, Westinghouse Electric said in a statement.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

GERB party say they will return the first mandate as soon as they receive it

Boyko Boris s ov, leader of the GERB-SDS coalition that won the parliamentary elections on October 27, announced he is withdrawing his candidacy for prime minister. At a briefing at the party headquarters he urged the PP-DB to..

published on 11/26/24 1:43 PM
Borislav Sarafov

Borislav Sarafov has the qualities to be elected Prosecutor General

Borislav Sarafov meets all the requirements and has the qualities to be elected Prosecutor General. This position was taken by the committees on attestation and competitions and on professional ethics at the Prosecutors College of the..

published on 11/26/24 1:18 PM

The first statue found at Heraclea Sintica probably depicts the grandson of Emperor Octavian August

The first marble stature discovered in the ancient city of Heraclea Sintica on 3 July,  is probably of Lucius – grandson of Roman Emperor Octavian August, announced Prof. Lyudmil Vagalinski who is in charge of the excavations...

published on 11/26/24 10:30 AM