Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Protest in front of the parliament against vote for regular government

Photo: BGNES

A protest organised by the "Vazrazhdane" party blocked the "Tsar Osvoboditel" boulevard in front of the parliament. The protesters are dissatisfied with the creation of the "Denkov-Gabriel" cabinet. According to "Vazrazhdane", 14 of the ministers in the draft cabinet were connected to the USA.

If the government receives approval, we will withdraw the current version of the budget and I hope that within 2 weeks we will have a version of the budget with a 3% deficit, Assen Vassilev, who is a candidate for finance minister, said. According to Vassilev, in order to reduce the deficit, revenues will be increased and expenses will be limited. He said that Bulgaria joining the Eurozone in 2025 was still a realistic goal.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Education minister Krasimir Valchev

Bilingual children returning from abroad should have additional Bulgarian lessons

The Bulgarian education system and the law on preschool and school education do not provide for the so-called language integration , Minister of Education Krasimir Valchev admitted to the relevant parliamentary committee. According to him, this means..

published on 3/21/25 1:28 PM
Radostin Vasilev

MECH are threatening with blockades and protests if their parliamentary group is not recognized

If there is no parliamentary group of the ''Morality, Unity, Honor'' party (MECH) on March 26, we will start blockades, said MECH leader Radostin Vassilev at a press conference. He demanded the resignation of National Assembly Speaker Natalia..

published on 3/21/25 12:04 PM

The construction of the Shipka tunnel may begin by the end of 2025

Another major infrastructure project in Bulgaria is moving forward. The technical project for the construction of the tunnel under Mount Shipka will be ready this year. If approved, the construction of the facility will begin as early as 2025,..

published on 3/21/25 11:39 AM