Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Prosecutor’s office demands that former cabinet minister from GERB be stripped of his immunity

Delyan Dobrev
Photo: BGNES

The Sofia City Prosecutor’s Office has submitted a request to the prosecutor general to demand that a former minister, now member of the 49th National Assembly with initials D. D. be stripped of his immunity.

The request is being made in connection with ongoing pre-trial proceedings for an alleged crime committed by the MP in question – massive dereliction of duty. The information provided makes it clear that the MP in question is Delyan Dobrev from GERB who has, according to the prosecutor’s office, caused damage to the National Electricity Company amounting to over EUR 4.5 million. The charges are that while he was energy minister, Dobrev failed to exercise control over the work of the Bulgarian Energy Holding, and that the parliamentary decision from 2012 for halting the Belene NPP project has not been observed.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM