"Bulgaria still depends on Russia for a number of parts and equipment for its nuclear power plant. We need them for the forthcoming planned repairs and maintenance", caretaker Minister of Energy Rosen Hristov said for the BNR with regard to the cabinet’s decision to approve a derogation of the EU sanctions against Russia enabling the Kozloduy NPP to purchase spare parts, materials and services.
"We are looking for alternative suppliers who can provide Bulgaria with such equipment and spare parts in the long term. We are working with all countries with such nuclear reactors. The key issue is to ensure Bulgaria's energy security and the operation of the Kozloduy NPP", Minister Hristov said. Rosen Hristov noted that this is not a one-off derogation and that such a derogation will be necessary in the future, because there are no substitutes for more than 40 components supplied by Russia.
Bulgaria's Ministry of Transport has been working for years to develop Corridor No. 8, connecting the Adriatic with the Black Sea through Albania, North Macedonia and Bulgaria. Of the 1,220 km of railway line along the corridor, 747 km are on the..
A little less than a month ago, Minister of Finance Temenuzhka Petkova presented, in Brussels, the headway Bulgaria has made along the road to joining the Eurozone. There, she stated that with its prudent fiscal policy, the country had earned its..
From March 9 to 11, 2025, Inter Expo Center in Sofia plays host to the 41st edition of Holiday & SPA Expo. The event, organized with the support of the Bulgarian Ministry of Tourism, traditionally becomes a meeting point for leading experts,..
+359 2 9336 661