A total of 90% of Ukrainians in Bulgaria are from the eastern regions of Ukraine that have suffered the biggest destruction, BTA reported. Therefore, their return there is impossible and every country that has accepted Ukrainian refugees on its territory must make efforts for their integration, UN High Commissioner for Refugees (UNHCR) representative to Bulgaria, Seda Kuzucu, has told the agency.
UNHCR has allocated 19.4 million US dollars for improving the situation of Ukrainians in Bulgaria and a large part of the funds will be used for provision of legal assistance, registration of documents, etc. Experts will work for their integration and employment, which will strengthen the independence of the refugees from Ukraine in Bulgaria. There will be joint work with 600 entities from the private sector, trade unions, financial and academic institutions in order to promote, facilitate and coordinate the integration of refugees.
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would lift its veto and that Bulgaria and Romania would probably become full members of Schengen from the..
President Rumen Radev met with Bulgarians living and working in Singapore during his visit to the Asian country on November 22-24. There are an estimated 400 Bulgarians living in Singapore. "Our diaspora in Singapore occupies a very special..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07..
+359 2 9336 661