Fishermen from the town of Veliko Tarnovo (Central North Bulgaria) protested against investment plans related to the construction of floating photovoltaic plants at the nearby dams. Protesters also supported their colleagues in Montana (Northwestern Bulgaria) who protest against the construction of a floating photovoltaic plant at Ogosta Dam.
"This is political and investment madness. Ultimately, we will lose our dams if such an investment is carried out," said Hristo Hristov who organized the protest in Veliko Tarnovo. Anglers expressed their concern that the floating photovoltaic plants endanger water and fish stocks.
"If a photovoltaic park is built at Ogosta Dam, it will not occupy the whole area and will not hinder economic and tourist activities, or fishing in the area" said caretaker Minister of Economy Nikola Stoyanov, noting that there is no final decision yet about the construction of the photovoltaic park.
“Investing in people, education, innovations and technologies is the key to success in the future,” said President Rumen Radev at the opening of the business forum in Singapore, in which representatives of companies from Bulgaria and Singapore are..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she said she was optimistic about Austria’s decision. Asked what the arguments are for blocking the..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th National Assembly, to be declared unconstitutional. These amendments concern the lifting of the..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07..
+359 2 9336 661