Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Bulgaria to buy 8 more F-17 fighter aircraft

F-16 Block 70
Photo: pan.bg

Bulgaria’s National Assembly adopted a draft investment expenditure for the acquisition of a new type of fighter aircraft - second stage, the BTA reported. 162 MPs voted in favour, 49 MPs voted against and 11 MPs abstained.

 GERB/SDS, the Movement for Rights and Freedoms, "Democratic Bulgaria", "Bulgarian Rise", as well as some MPs from "We Continue the Change" party voted in favor. 10 MPs from"We Continue the Change" abstained and 1 MP voted against. BSP for Bulgaria and Vazrazhdane also voted against. 

The project provides for equipping and arming of one squadron of 16 F-16 Block-70 multirole fighter aircraft and completing the process of building and utilizing the aviation equipment, armament and ground systems within the first and second stages of the project for acquiring a new type of combat aircraft.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Made in Bulgaria – Union of Small and Medium Enterprises presents its annual awards

The association "Made in Bulgaria – Union of Small and Medium Enterprises" will hold its 31st Golden Martenitsa Award Ceremony this evening at 6:00 pm. President Rumen Radev is also expected to attend the event. The "Golden Martenitsa" award was..

published on 2/27/25 6:10 AM

Cloudy and foggy weather expected on Thursday, temperatures in wide limits

On Thursday, minimum temperatures in Bulgaria will be in wide limits, from minus 6° - minus 8°C in places with fog, to about 5°C in the extreme southwestern regions of the country. In Sofia, it will be about minus 1°C.  During the day,..

published on 2/26/25 7:15 PM
Deputy Premier Tomislav Donchev

Bulgaria will try to save part of the second payment under the Recovery and Resilience Plan

Our country has a six-month deadline until the end of August 2025 to restart the process of adopting the laws related to the Recovery and Resilience Plan. This will be done in an attempt to save most of the second payment under the plan,..

published on 2/26/25 6:32 PM