After Unit 6 of the Kozloduy Nuclear Power Plant was put into operation, a leak was ascertained in the coolant system of the electricity generator. Tests are being conducted to identify the cause of the problem, Minister of Energy in the caretaker government Rossen Hristov said for bTV.
“Until the leak is eliminated, the unit will remain disconnected from the national electric energy grid. There is no change in radiation levels. The problem is technical and it is in the non-nuclear part of the system. The reactor is in normal mode,” Minister Hristov said, and added that he hoped the deadline for completing the scheduled annual maintenance – 3 November - will be met.
Experts from the Ministry of Transport and Communications are proposing the division of Bulgarian State Railways (BDZ) into three lots. According to them, this is a first step toward a more efficient and modern railway transport system, reported..
The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana Nikolova clarified that there are currently isolated positive cases of influenza. COVID-19 also..
The Bulgarian Antarctic base "St. Kliment Ohridski" officially opened its doors on the eve of its patron saint's day . The members of the Bulgarian Antarctic expedition, led by Professor Hristo Pimpirev, set foot on the snowy shores of Livingston..
As of next year, use of solid fuels for domestic heating in buildings which are part of central heating and gas supply networks will be banned in nine..
The number of crimes committed in the conditions of domestic violence has gone up by 54% since the beginning of the year compared to last year, the..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
+359 2 9336 661