After Unit 6 of the Kozloduy Nuclear Power Plant was put into operation, a leak was ascertained in the coolant system of the electricity generator. Tests are being conducted to identify the cause of the problem, Minister of Energy in the caretaker government Rossen Hristov said for bTV.
“Until the leak is eliminated, the unit will remain disconnected from the national electric energy grid. There is no change in radiation levels. The problem is technical and it is in the non-nuclear part of the system. The reactor is in normal mode,” Minister Hristov said, and added that he hoped the deadline for completing the scheduled annual maintenance – 3 November - will be met.
The truck traffic on the Maritsa highway to the Kapitan Andreevo border crossing at the Bulgarian-Turkish border is now normalized. "As of this morning, there are no more queues of trucks standing on the roadway waiting to cross the border," assured..
At the request of the European Public Prosecutor's Office, searches have been carried out in Sofia, Burgas, Petrich and Rila in connection with an investigation into alleged fraud with EU funds in the restoration of a church. In 2017, a public tender..
One million and eight hundred Bulgarian citizens travelled as tourists during the third quarter of the year, National Statistical Institute data show. 72.3% of them travelled inside the country, 20.8% travelled abroad and 6.9% - both inside Bulgaria..
According to an analysis by the Electricity System Operator, a shortage of electricity is expected as early as January and February next year. At a..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
+359 2 9336 661